Here I connect the ground wire for the center panels into the ground wire that runs parallel the tracker main spar and connects all the panels together with the steel of the tracker frame spar. Then I run a bendable ground wire grounded to the spar and to the main 6" pipe post below the ring gear. I grounded the tracker frame to the post, bypassing the ring gear where there may be bad contact. Now we are grounded through to the two ground rods. TRACKER INSTALLATION page 1 page 2 page 3 page 4 page 5 page 6 page 7 page 8 page 9 page 10 page 11 page 12 page 13 page 14 page 15 page 16 page 17 Page 18 page 19 |
|